LIS Winterization Schedule 2025
Before your visit:
Gates unlocked • Pets secured • Controller accessible • Backflow access clear • Any codes/instructions shared
If the schedule is adjusted for weather or other reasons, we will update as quickly as possible. Last Update: 10/28/25
Winterization FAQs
-
No. In our area, draining the system, relieving pressure, and removing/disassembling backflow assemblies is sufficient and helps avoid cumulative air-pressure wear on valves and heads.
-
Only if inside access is required to reach your controller. Otherwise, no.
-
We’ll skip the stop and reschedule to keep routes on time; rescheduling may include a trip charge and a later date.
-
If a deep freeze is forecast before your date: set controller OFF and, if safely accessible, close the irrigation shut-off. We’ll finish full winterization on your route.